Anonymous source says:
There is a heated driveway up to the front door in the main office building. They are digging up the ground now to put in the system for it. Its heated by a boiler system, tons of manifolds in there to control it all. Pretty swanky. Also heated floors about 3' back from the windows inside. I guess a cold floor isn't conducive to work.
GB conference room is giant. Its about 28' X 45' Big conference table in the middle with screens in the table. Fancy metal ceiling. Plans are included in photos
Museum walls are up. Curved walls that takes you around in a maze of displays. Skylight above the area is nice. They are welding all the fire suppression in the area in this area only to keep any leaks from damaging the displays.
There are about 15 rooms for disabled people. Roll in showers. Same area as the infirmary. I guess this will need to be remodeled pretty quickly since no one will need disabled rooms in the near future. these are the first few photos on the album along with the plans.
There's a barber and beauty salon but they are in separate areas. Strange. Wouldn't want anyone to run into each other on their way to get done up.
Watchtower at main entrance is finished. Looks like a big beacon.
They are moving temp workers into one of the residence buildings. No alcohol or visitors. Sucks for them. Also sucks for the bethelites that thought they would get a brand new room, nope someone is going to break it in for you.
I'm surprised how much work is being completed since so much of the day is taken up with travel time and safety meetings/checks.