The building work that is being stop is major construction. Assembly halls or Remote translation offices. KH are still going to be built. I talk to branch comitee member that's not in the U.S branch. He told me they have a template letter that the U.S branch sent them. It's a 25 percent reduction around the world. Much smaller then at first talked about.
He is in the Mexico branch the first number they told them were reduction of 700-800. Newest number is from 300-400. Their is slight change of the number going home.