I have a cousin that goes to that hall. I'm getting updates almost daily. I'll try and post them here.
Heres todays: I had a chance to visit our burned out KH and it is a mess. Whoever did it torched the front door area and the doors were completely distroyed. The whole front entrance area was burnt along with the library and all the books. The fire distroyed 1/4 of the roof on one side of the building. Since we had 4 roof top A/C units on the roof it look like three can be reused. The brothers were able to salvage some of the chairs and the files that were in an area opposite the fire. There was heavy smoke damage but they were able to recover all important papers. The RBC was at the KH the next day and recommended to completely remove the whole building and start new. The adjoining congregations opened there doors so we have places to meet. Since 4 congregations were meeting in the hall, we were the largest congregation so we will completely move our meetings to a different KH temporarily. The other congregations will be absorbed into other congregations for the time being. The RBC expects to have the new building done and complete in 2 months. It's a good goal, so we will see if that happens. Due to delivery of some items, I expect the building to be completed between 2-3 months. Once they clear the building it is possible that we will need to install a new concrete slab. The existing slab has a large crack down the middle so I have been told but that was repaired years ago. We will need new concrete slab for the addition we had proposed to add on but the RBC was having us wait because there are too many KH's that are need in the Phoenix area. Besides BS, the growth in Phoenix is 3500 a month moving in. We are now the 5 largest city in the United States. We exceeded San Diago 2 years ago. So now we are top priority on the RBC's list, all work including the proposed addition will we done at the same time. The Society had us open a seperate bank account and money will be transfered into that account.